Project intelligence
Browse
Directory
Workspace
Explore 12,612 tender opportunities across New Zealand from 4,440 organisations. 85 records published in the last 7 days. Search live tenders, RFPs, RFQs, EOIs and open supplier panel invitations across New Zealand.
Apply additional filters to the opportunities currently shown.
Opportunity alerts
Receive an email when a new tender matches this search.
Your saved searches
Sign in to use saved searches
10,804 opportunities
Project intelligence
Essential infrastructure replacement on Totora Street, Whanganui. Whanganui District Council is seeking qualified, competent contractors to undertake essential infrastructure replacement on Totora Street, Whanganui.
Project intelligence
The construction of cut off walls around clarifiers 3 & 4, and clarifiers 1 & 2.
Project intelligence
A renewal of the Wi Neera playground and improvements to the esplanade reserve embankment, to meet the required levels of service, by establishing access to the harbour’s edge and improving the overall harbour condition. Incorporate an existing 'coastal resilience' design in the overall landscape/redevelopment plan for the reserve.
Project intelligence
Description of the Contract Works: Removal & Replacement of the existing roof to the administration block, including re-pitching, removal of the boiler flue and chimney, and installation of new roofing, skylights, spouting, and weatherboards to achieve full weathertightness and All applicable project specific details: Allowance for potential timber rot and coordination with school for temporary relocation of affected staff.
Project intelligence
Tautoro School is undertaking the next stage of Block 1 refurbishment, continuing upgrades completed previously in Classrooms 1 & 2. New floor coverings, replacement window joinery, upgraded heating systems, and new classroom cubbies.
Project intelligence
Remove and replace existing 1.4m bar fencing with 1.8m bar fencing, new pedestrian and vehicle gates along the north and northwest boundaries including new tri latch locks.
Project intelligence
The installation of access ramps & automatic door openers.
Project intelligence
The purpose of this Request for Proposal (RFP) is to engage design and build services for a modular office facility to be located on an existing (DOC) site in Tūrangi. The project aims to deliver a fit-for-purpose, and cost-effective modular office solution that meets operational requirementS.
Project intelligence
The Northland Events Centre (Semenoff?Stadium) Roof Replacement Project.? The project involves the demolition and removal of the existing roof and supporting steel structure, followed by the construction of a new mono-pitch roof over the main grandstand.
Project intelligence
The school wishes to Create breakout spaces within J Block by modifying the areas between existing classrooms, upgrade to DQLS including replacement of floor, wall, and ceiling linings and LED. Reconfigure the toilets in K Block to form a breakout space, retaining two existing toilets and the accessible toilet.
Project intelligence
When complete, the renewed bridge will improve asset condition, reduce maintenance demand, and support KiwiRail's programme of ongoing investment in core network infrastructure. The Bridge 187 Renewal Project involves the complete replacement of Bridge 187 on the Main North Line (MNL) with a box culvert structure in a critical freight and passenger corridor within KiwiRail's national network.
Project intelligence
To upgrade the existing radio communications infrastructure at Wainui 2 to enable Reservoir Levels to be available to the CCC Network SCADA system.
Project intelligence
Build 3x Netball Courts with Multi-Use Fields.
Project intelligence
The renewal of approximately 205m of watermain pipe on Carron Street, Invercargill. The supply of all labour, materials and plant necessary for the renewal of approximately 205m of watermain pipe on Carron Street, Invercargill.
Project intelligence
The Board of Trustees at Long Bay Primary School Acquire a suitably qualified contractor to carry out a demolition of the existing library and construct a new library in Block 1.
Project intelligence