The dismantling and replacement of a staircase and footbridge within the Cardiff Walkway.
Project intelligence
Browse live tenders and procurement opportunities issued by Stratford District Council. Find current RFPs, RFQs, EOIs, contract notices and upcoming projects. TenderBay tracks procurement activity from 390+ New Zealand buying organisations and 22,500+ historic contract awards.
Apply additional filters to the opportunities currently shown.
Opportunity alerts
Receive an email when a new tender matches this search.
Your saved searches
Sign in to use saved searches
35 opportunities
The dismantling and replacement of a staircase and footbridge within the Cardiff Walkway.
Project intelligence
To address this issue, SDC has allocated funding for the design and implementation of remedial works.
Project intelligence
Year 2: $510,350 in the 2025/26 financial year for implementation of lighting along Broadway and Stage 2 of construction of the Prospero Place development. Council has earmarked approximately $1.2 million in years 1 to 3 of the 2024/34 Long-Term Plan for the design and construction of a town centre in the Stratford CBD.
Project intelligence
To address this issue, SDC has allocated funding for the design and installation of a reservoir overflow system. Stratford District Council (SDC) has undertaken a significant commitment within its Long-Term Plan to enhance the efficiency and environmental responsibility of its water treatment operations.
Project intelligence
Project intelligence
Stormwater seepage into the newly installed lateral drains has been at an unsatisfactory hydrological conductivity rate, making the drains ineffective with insufficient drainage of the grass surface. Since the installation of the drainage system was installed, Field Two has also experienced drainage issues, resulting in surface water not draining away in an adequate amount of time.
Project intelligence
The Contractor will require to rehabilitate these gravity sewer mains to extend the remaining service life in order maintain required levels of service in relation to reticulation network. This project involves the relining of existing sewers to improve the performance, and extend the life, of the Stratford District Council wastewater network.
Project intelligence
Project intelligence
The construction of a 7m long retaining wall on Mangaoapa Road at RP 1.0 and installation of timber kerbing and concrete approach paving to the Mangaoapa Road Tunnel at RP 0.7 and within the Stratford District Council's Rural Road Network.
Project intelligence
The Stratford District Council (SDC) propose to renew a 155 m section of the existing Ø 100 mm AC water main on Pembroke Road, between Cordelia Street and Swansea Road.
Project intelligence
Due to a recent judicial ruling, SDC has allocated funding to construct security fencing around the Wastewater Treatment Plant site. The land around the wastewater ponds is grazed by a local famer and currently has stock proof fencing installed.
Project intelligence
The geometric improvements to Opunake Road and remedial concrete paving works to the Dunn's Bridge approaches on Opunake Road.
Project intelligence
Project intelligence
The overall objective is to strengthen active modes of travel as a key mode of travel to schools, thereby competing effectively with private vehicle use. The successful implementation of this project will contribute to the reduction of VKT and support the achievement of central government's transport targets in the Emissions Reduction Plan.
Project intelligence
This will be achieved through the replacement of the existing 150 mm Ø pipe with a 300 mm Ø uPVC rubber ringed pipe.
Project intelligence
Removing the polycarbonate roofing over the foyer and reinstatement of the ceiling to match the ceiling height that exists in Sergeant Peppers Café and Replacing the existing roof on the northwestern side of the PPT building. As a result of the investigation, remedial work may be required.
Project intelligence