The decommissioning of the existing Air Handling Unit (AHU)-gas boiler and the installation of a new HVAC unit along with various fabrication and construction, new pipework and electrical work within and on top of the Boiler Room. The proposed new AHU & Heat Pump Chiller installation is required to meet heat load requirements and maintain existing functionality of the ground floor and first floor public spaces of the Rotorua L...
Project intelligence