Project intelligence
PF1278, 306-316 Penny Road - school and schoolhouse are vacant, the school buildings need an archaeological authority to disturb soil so we will be demolishing the school building to slab and The house can be removed under ADP. Due to the poor condition of these structures' demolition has been recommended to clear the site of hazards in preparation for future use.
Project intelligence
The buildings no longer fit for purpose, are not economical to repair and are to be demolished. There are four structures onsite; the primary structure, the Workshop (pre-1956), is a single-story industrial building with a saw tooth roof and concrete slab and the building is approximately 110m long by 24m wide, is timber framed and primarily clad with asbestos sheeting with a lightweight iron roof.
Project intelligence
This Landbank house is in a poor condition.
Project intelligence
Project intelligence
We have four houses in Auckland that are in a poor condition, we need to demolish the structures to remove the risk of these dwellings.
Project intelligence
Project intelligence
Project intelligence
Project intelligence
The house contains soft asbestos stippled ceilings that crumble on impact, we have undertaken air monitoring at the property, there were no airborne fibres identified. The front porch is cracked asbestos cement board.
Project intelligence
This is an asbestos removal and demolition project of a commercial building on a future school site.
Project intelligence
Demolition of a commercial building - this is a future school site.
Project intelligence
Several environmental investigation reports have been undertaken on the site since 2017 and have concluded that the sludge material in the pond is contaminated with heavy metals and biological contamination. Aurecon consultants have completed a rules assessment that is appended to this DWR which outlines the likely requirements of the consenting authorities.
Project intelligence
Project intelligence
Due to the condition of the buildings demolition has been recommended to clear the sites of hazards in preparation for the transfer to iwi.
Project intelligence
Super structure demolition works; Sub structure demolition backfill and site levelling works; and removing vacant built structure and the site is to be finished in a clear, tidy, and safe condition. An Asbestos and Lead Demolition Survey was conducted on the site in April.
Project intelligence