Of two separable portions - Portion 1 footpath renewal of Glenmark Drive, Waipara. The replacement of asphalt driveways/vehicle crossings with new asphalt driveways/vehicle crossings.
Project intelligence
Browse live tenders and procurement opportunities issued by Hurunui District Council. Find current RFPs, RFQs, EOIs, contract notices and upcoming projects. TenderBay tracks procurement activity from 390+ New Zealand buying organisations and 22,500+ historic contract awards.
Apply additional filters to the opportunities currently shown.
Opportunity alerts
Receive an email when a new tender matches this search.
Your saved searches
Sign in to use saved searches
29 opportunities
Of two separable portions - Portion 1 footpath renewal of Glenmark Drive, Waipara. The replacement of asphalt driveways/vehicle crossings with new asphalt driveways/vehicle crossings.
Project intelligence
The upgrade of watermain from Henrys Ford Road, along Loburn Whiterock Road and Hodgsons Road, and to connect on to existing watermains. The project will also consist of valves, fire hydrants, gate valves, and connections to existing watermains in conjunction with the installation of new watermain, including testing, sterilisation and commissioning.
Project intelligence
A new manhole will be installed inline existing pipeline at the start of Caverhill Road. 363, the pipeline will replace existing asbestos concrete pipe with DN225 uPVC between manholes leading.
Project intelligence
From the recently completed town watermain replacement pipeline in Hawarden heading south towards the township of Waikari. The Contractor is to supply and install the DN63 PE100 PN12.5 pipe, all bridge hangers, sleeve pipes, all Valves, Hydrants, dress sets, fittings, connections and to perform all required pipe testing and pipe welding including any required.
Project intelligence
The installation of a new pumping main to replace the existing aging pipeline, starting at the existing line on Motunau Beach Road (approx. The Contractor is to supply and install all valves, fittings, connections and to perform all required pipe welding Inc. any required welding test certs.
Project intelligence
The installation of a new pumping main to replace the existing aging pipeline, starting at the existing line on Leamington Road then heading along Downs Road and finishing on Sinclair Road. The Contractor is to supply and install all valves, fittings, connections and to perform all required pipe welding Inc. any required welding test certs.
Project intelligence
The installation of a dedicated bulk main from a recently installed new bore/Well at Hursley Terrace Road, along the right of way, to then join the above pipeline to the water treatment plant on Kowai River Road, Amberley.
Project intelligence
Replacement of asphalt and chipseal surfaces with the concrete footpaths, not Including any Driveways or vehicle crossings, to maintain safe, effective, accessible and fit for purpose footpaths.
Project intelligence
The development of the Eastern Reserve into an Irrigated Sports Field. The supply and installation of site wide temporary fencing, plan and implementation of an erosion & sediment plan, to facilitate the spraying off of the existing surface area prior to commencement of earthworks.
Project intelligence
The installation of a new pumping main to replace the existing aging pipeline, starting from the newly installed pipeline on the first terrace above the intake Reservoir at 1324 Greta Road, the pipeline will run west towards the farm entry gate on state highway, then to the top of the hill to connect to the first Reservoir, continue along the peak to the finish at the second reservoir. The pipeline will consist of approximatel...
Project intelligence
Tenders are invited for the contract to undertake repairs to bridges located within the Hurunui District. Temporary waterway diversion and site dewatering; Deck joint repairs; Earthworks and placement of rock; and Miscellaneous associated works such as repair of pavement longitudinal cracking, drainage dropper.
Project intelligence
The replacement of watermain from SH7 Mountainview Road junction at St Leonards Street to south of the Culverden township boundary. The pipeline consists of approximately 720 metres of DN180 PE100 PN12.5, and approximately 520 metres of DN63 PE100 PN12.5, of which 450 metres will be in a common trench with the DN180.
Project intelligence
The replacement watermain from the headworks at 30 Kowai River Rd south of the township to SH1 Carters Rd, Junction of Banks Street Amberley. The pipeline consists of approximately 1120 metres of DN250 PE100 PN16, approximately 3200 meters of DN250 PE100 PN12.5 and approximately 850m of DN63 PE80 PN12, of which 635m will be in a common trench with the DN250.
Project intelligence
The existing watermain and laterals will be required to remain 'live' during construction to maintain services to local residential properties and shall be abandoned with the connection of the new mains to the existing network. The proposed footpath works consist of ground preparation, installation rehabilitation of approximately 45 metres of lime chip footpath and 470 metres of concrete footpath.
Project intelligence
The proposed works consist of installation of approximately 4800 m of DN250 PE100 PN12.5, and approximately 1300 m of DN90 PE100 PN12.5 sub-main. The existing watermain and sub-main will be required to remain live during construction to maintain services to local residential properties until the connection of new watermain to the existing network.
Project intelligence
The proposed works consist of installation of approximately 6600m of PE DN315 PN12. The proposed watermain upgrade runs along Powers Road then along Lake Sumner Road.
Project intelligence