Stillwater Boat Ramp Renewal
Published 31 Jul 2020
Auckland
Auckland Council
Stillwater Boat Ramp Renewal
Auckland Council
Contract details
The Stillwater Boat Club has an existing boat ramp providing access to the low water channel of the Wade River. The existing ramp is in poor condition and is to be re-constructed. The work includes: Demolition and removal of the existing structure Construction of a new replacement ramp The work is within the coastal area in a sensitive environment and the lower part of the…
The Stillwater Boat Club has an existing boat ramp providing access to the low water channel of the Wade River. The existing ramp is in poor condition and is to be re-constructed. The work includes: Demolition and removal of the existing structure Construction of a new replacement ramp The work is within the coastal area in a sensitive environment and the lower part of the ramp extends to and beyond the low tide mark. The site will be within the Boat Club area and public reserve and care will be needed to ensure public safety and minimise the effects on the adjacent amenities
Regions
Categories
- Engineering and Research and Technology Based Services
- Land and Buildings and Structures and Thoroughfares
- Public Utilities and Public Sector Related Services
- Electrical Systems and Lighting and Components and Accessories and Supplies
- Structures and Building and Construction and Manufacturing Components and Supplies
- Building and Construction Machinery and Accessories
- Building and Facility Construction and Maintenance Services
Buyer
17553251
Awarded suppliers
View awarded suppliers
Upgrade to Pro to identify the organisations awarded this contract and access their supplier profiles.
Similar opportunities
Finding tenders with similar work types, categories, locations, or project scope.