The goal of this Contract is to renew approximately 494m of sewermain to new DN375 PVCu SN16 pipeline and 36m of DN450 SDR17 PE100 pipeline. The pipeline installation starts from
• Along Leckie St approximately at the frontage of 47 Leckie St (Kensington Pump Station) manhole to SH1;
• Across SH1 from Leckie St to Coopers Lane intersections;
• Along Coopers Lane from SH1 to existing manh...
The goal of this Contract is to renew approximately 494m of sewermain to new DN375 PVCu SN16 pipeline and 36m of DN450 SDR17 PE100 pipeline. The pipeline installation starts from
• Along Leckie St approximately at the frontage of 47 Leckie St (Kensington Pump Station) manhole to SH1;
• Across SH1 from Leckie St to Coopers Lane intersections;
• Along Coopers Lane from SH1 to existing manhole (MH181398) at the frontage of 133A King St.
The new pipeline will allow Council to meet their specified levels of service, and the performance measures set out below.
• Renewed pipeline service life of 100 years.
• Protect the health and safety of the community.
• Minimise environmental impacts.
• Maintain the reliability of the wastewater networks.
• Comply with relevant statutes and regulations.
Contract Valuation
Contract Value ($ NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Download this opportunity
Download all RFx documents:
- Tender RFx (RFP/ROI)
- Pricing Schedule
- Tender Documents
Instant delivery to your inbox
Timeline
Open Date
Tender opened
14 Jul 2025
17 days ago
Closing Date
Tender closing
14 Aug 2025
in 14 days
Clinical Services - Request for Application
Low Emissions Heavy Vehicle Fund
Vocational Medical Services (VMS) Services Contract