LSPM Fencing at Riverton School
To accommodate the needs of an enrolled student an MOE occupational therapist completed a report on fencing modifications required to ensure the safety of the student.
Project consultants are:
Project Manager: James Crawford SSL Consulting
Quantity Surveyor: Doug Riley, Southern Quantity Surveyors
Lead Designer: Robert Birch, Birch & Pine
The Contract Works required are:
Project consultants are:
Project Manager: James Crawford SSL Consulting
Quantity Surveyor: Doug Riley, Southern Quantity Surveyors
Lead Designer: Robert Birch, Birch & Pine
The Contract Works required are:
Remove existing boundary fencing/gates and prune back or remove trees and shrubs to allow clearance for new fencing.
Install 1800mm High metal bar fencing school fence panels to the main entrance and carpark area on Leader Street including accessible gate (s).
The boundary fence along Princess Street is to be replaced with galvanised school fence panels from the corner of Leader Street to the west side of the hall carpark. The remaining boundary fence along Princess and Ngarimu Streets to be replaced with 1800mm high folded rigid wire fencing.
Colorsteel fencing is to be installed between the school and neighbouring properties on Leader Street
The Contractor will be engaged through a Medium Works Contract
Timeframes are:
Indicative Start date: June 2025
indicative Due Date for Completion: July 2025
Contract Valuation
Contract Value (NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Timeline
Open Date
Tender opened
24 Apr 2025
21 days ago
Today
Today's date
15 May 2025
—
Closing Date
Tender closing
21 May 2025
in 6 days
Tender documents
Download RFx documents:
- Tender RFx (RFP/ROI)
- Pricing Schedule
- and many more...
Closes in 5 days.