Back

Hollyford Track - Swamp Creek Bridge Replacement Project

Hollyford Track - Swamp Creek Bridge Replacement Project
Closing 26 Aug 2025
Reference Number 32102730
Organisation
Department of Conservation
Open Date Monday, 21 July 2025, 12:00 PM
Closing Date Tuesday, 26 August 2025, 12:00 PM
Region Southland

The five-year SSI Flood Recovery Programme was stood up to repair and rebuild DOC infrastructure damaged following a severe flood event in February 2020. Swamp Creek Bridge was one such asset damaged. Although temporarily repaired as part of Tranche 1 of the Programme, full bridge replacement in a more resilient location is planned for Tranche 2.

Swamp Creek Bridge (Fiordland National Park)...
The five-year SSI Flood Recovery Programme was stood up to repair and rebuild DOC infrastructure damaged following a severe flood event in February 2020. Swamp Creek Bridge was one such asset damaged. Although temporarily repaired as part of Tranche 1 of the Programme, full bridge replacement in a more resilient location is planned for Tranche 2.

Swamp Creek Bridge (Fiordland National Park) is located on the Hollyford Track, approximately 45min walk from the trailhead on the Lower Hollyford Road. The Swamp Creek site previously had two bridges: the main 18m alloy truss bridge and a smaller steel truss bridge over an adjacent water channel. The 2020 floods destroyed the smaller steel truss bridge, but the 18m bridge was unaffected. However, the resilience of the existing bridge is relatively low, hence this project is a longer-term solution for this site.

A Detailed Business Case (DBC) for this project was approved on 12 May 2025. It allows for the construction of a new, 59 m long Swamp Creek suspension bridge in a more resilient location. The existing bridge will be removed from site and repurposed at another yet to be determined location.

The purpose of this procurement is to source a construction contractor to build a new Swamp Creek Bridge. The scope of the works is therefore to:

1) Supply and construction of the 59m span Swamp Creek suspension bridge (as per approved design and specifications), and
2) All associated establishment, disestablishment, and other works necessary to complete the bridge construction works (to the agreed design and specification).
3) Minor track works (to connect bridge to existing track).

Contract Valuation

Contract Value (NZD)

Duration

The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.

Map

Sign in to unlock more.

By signing in, you will be able to:

  • See contract valuation estimates.
  • View similar opportunities.
  • Use BidAssist — a robust bidding assistant for a competitive edge.
  • See Tender Intelligence — download documents relevant to this opportunity.
  • Timeline

    Open Date

    Tender opened

    21 Jul 2025

    6 days ago

    Today

    Today's date

    27 Jul 2025

    Closing Date

    Tender closing

    26 Aug 2025

    in 30 days

    Tender documents

    Download RFx documents:

    • Tender RFx (RFP/ROI)
    • Pricing Schedule
    • and many more...

    Closes in 29 days.