GDC Construction of Interconnecting Water Mains
Gore District Council are proposing new raw water and treated water mains installation to and from the East Gore water treatment plant, this work is to allow GDC to meet the requirements of the New Zealand Drinking Water Standards.
We encourage all tenderers to make a site visit to familiarise themselves with the location and proposed alignment.
Full description of the works is within the te...
Gore District Council are proposing new raw water and treated water mains installation to and from the East Gore water treatment plant, this work is to allow GDC to meet the requirements of the New Zealand Drinking Water Standards.
We encourage all tenderers to make a site visit to familiarise themselves with the location and proposed alignment.
Full description of the works is within the tender documents.
Contract Valuation
Contract Value (NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Timeline
Open Date
Tender opened
26 May 2025
30 days ago
Today
Today's date
26 Jun 2025
—
Closing Date
Tender closing
30 Jun 2025
in 5 days
Tender documents
Download RFx documents:
- Tender RFx (RFP/ROI)
- Pricing Schedule
- and many more...
Closes in 4 days.