Environmental Options Assessment for Spoils Disposal for Upper Nihotupu & Huia Watermain Replacements
Watercare is conducting projects in the Western Auckland area to upgrade the aging infrastructure currently in operation. The replacement of the Upper Nihotupu and Huia Raw Watermains will result in the excavation of significant volume of spoil that requires sustainable and compliant disposal. Additionally, the ongoing operations of Water Treatment Plant (WTP) in the area will produce sludge, whi...
Watercare is conducting projects in the Western Auckland area to upgrade the aging infrastructure currently in operation. The replacement of the Upper Nihotupu and Huia Raw Watermains will result in the excavation of significant volume of spoil that requires sustainable and compliant disposal. Additionally, the ongoing operations of Water Treatment Plant (WTP) in the area will produce sludge, which must be managed to meet regulatory and environmental standards.
Both activities above are integral to the success of the raw watermain replacement project and long-term operational efficiency. We require investigation works to be carried out to determine how and where these spoils and sludge can be disposed of in compliance with the environmental and regulatory requirements.
Contract Valuation
Contract Value (NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Timeline
Open Date
Tender opened
11 Jun 2025
14 days ago
Today
Today's date
26 Jun 2025
—
Closing Date
Tender closing
16 Jul 2025
in 20 days
Tender documents
Download RFx documents:
- Tender RFx (RFP/ROI)
- Pricing Schedule
- and many more...
Closes in 19 days.