The Principal (Hurunui District Council) is looking for a suitably qualified Contractor to undertake the construction of the proposed contract is for the installation of a new pumping main to replace the existing aging pipeline, starting at the existing line on Leamington Road then heading along Downs Road and finishing on Sinclair Road.
The main tasks involved in this Contract are:
The main tasks involved in this Contract are:
The pipeline is approx. 4695m of DN250 PE100 PN16. The Hurunui District Council will supply the pipe, but the contractor must liaise with the pipe supplier for the timing of the pipe deliveries. The Contractor is to supply and install all valves, fittings, connections and to perform all required pipe welding Inc. any required welding test certs. The Contractor will also be responsible for all health, safety and environmental aspects of the project. The Contractor will be responsible for the reinstatement of all surfaces.
Contract Valuation
Contract Value ($ NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Download this opportunity
Download all RFx documents:
- Tender RFx (RFP/ROI)
- Pricing Schedule
- Tender Documents
Instant delivery to your inbox
Timeline
Open Date
Tender opened
24 Jul 2025
7 days ago
Closing Date
Tender closing
26 Aug 2025
in 26 days
Clinical Services - Request for Application
Low Emissions Heavy Vehicle Fund
Vocational Medical Services (VMS) Services Contract