Back

Ava Rail Bridge Shared Use Path Replacement ECI

Ava Rail Bridge Shared Use Path Replacement ECI
Closing 15 Aug 2025
Reference Number 32146779
Organisation
Hutt City Council
Open Date Monday, 28 July 2025, 12:00 PM
Closing Date Friday, 15 August 2025, 2:00 PM
Region Wellington

HCC is seeking to engage a qualified and experienced contractor to deliver Early Contractor Involvement (ECI) services followed by physical construction of the Ava Rail Bridge Shared Use Path Replacement project. The project involves replacing an ageing pedestrian structure with a new, safe, and accessible shared use path clip-on alongside the Ava Rail Bridge — a key link in Lower Hutt’s active tr... HCC is seeking to engage a qualified and experienced contractor to deliver Early Contractor Involvement (ECI) services followed by physical construction of the Ava Rail Bridge Shared Use Path Replacement project. The project involves replacing an ageing pedestrian structure with a new, safe, and accessible shared use path clip-on alongside the Ava Rail Bridge — a key link in Lower Hutt’s active transport network.
The successful Respondent will work collaboratively with HCC, the appointed design consultant, and Quantity Surveyor (QS) during the ECI phase to provide input on construction methodology, staging, buildability, risk management, and cost validation. Following the completion of the design and consenting phase, the Respondent will then deliver the full construction works, with a target construction start date of January 2026

Contract Valuation

Contract Value ($ NZD)

Duration

The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.

Map

Sign in to unlock more.

By signing in, you will be able to:

  • See contract valuation estimates.
  • Use BidAssist — a robust bidding assistant for a competitive edge.
  • Use Tender Intelligence — download documents relevant to this opportunity.
  • Download this opportunity

    Download all RFx documents:

    • Tender RFx (RFP/ROI)
    • Pricing Schedule
    • Tender Documents

    Instant delivery to your inbox

    Timeline

    Open Date

    Tender opened

    28 Jul 2025

    3 days ago

    Closing Date

    Tender closing

    15 Aug 2025

    in 15 days

    Title
    Ava Rail Bridge Shared Use Path Replacement ECI
    Organisation
    Hutt City Council
    Last Updated
    31 Jul 2025
    Closing Date
    15 Aug 2025 02PM
    Status
    Open
    Tender Type
    Public
    Categories
    Created
    3 days ago
    More similar opportunities

    Restoration Services Panel

    Open Closing in 2648 days
    Wellington
    Greater Wellington Regional Council

    Clinical Services - Request for Application

    Open Closing in 1064 days
    17 Regions
    Accident Compensation Corporation

    Low Emissions Heavy Vehicle Fund

    Open Closing in 1033 days
    17 Regions
    Energy Efficiency & Conservation Authority