Ava Rail Bridge Shared Use Path Replacement DSG
HCC is seeking to engage a qualified and experienced design consultancy to deliver the design, planning, and consenting services for the Ava Rail Bridge Shared Use Path Replacement project. This project involves replacing an ageing pedestrian structure with a safe and accessible shared use path clip-on alongside the Ava Rail Bridge, a key connection in Lower Hutt’s active transport network.
The successful Respondent will be responsible for delivering the full design scope from concept through to Issued for Construction (IFC), and preparing and lodging a land use consent application with HCC and Greater Wellington Regional Council (GWRC). Coordination with Council’s internal teams, the Quantity Surveyor (QS), and input from the Early Contractor Involvement (ECI) phase will be critical to ensuring the design is buildable, cost-effective, and ready for construction January 2026.
This RFP relates to Hutt City Council’s (HCC’s) commitment to delivering safe, inclusive, and connected active transport infrastructure that supports walking, cycling, and broader sustainability and accessibility goals across the city. The Ava Rail Bridge Shared Use Path Replacement project directly contributes to these objectives by upgrading a key strategic route in the network.
Contract Valuation
Contract Value (NZD)
Duration
The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.
Map
Sign in to unlock more.
By signing in, you will be able to:
Timeline
Open Date
Tender opened
22 Jul 2025
4 days ago
Today
Today's date
27 Jul 2025
—
Closing Date
Tender closing
08 Aug 2025
in 13 days