This is a Physical Works contract for the refurbishment of SH25 Moana-Anu-Anu (Wentworth) River Bridge (BSN 2122). The physical work is to be undertaken during a six-week road closure scheduled between Wednesday 29th October to Tuesday 9th December 2025.

Due to the long lead time to procure materials, NZTA will supply the 195mm thick engineered plywood deck panels. The panels will be availa...
This is a Physical Works contract for the refurbishment of SH25 Moana-Anu-Anu (Wentworth) River Bridge (BSN 2122). The physical work is to be undertaken during a six-week road closure scheduled between Wednesday 29th October to Tuesday 9th December 2025.

Due to the long lead time to procure materials, NZTA will supply the 195mm thick engineered plywood deck panels. The panels will be available for collection from the possession of site date, from NZ Wood Products, 149 Kerr's Rd Wiri, Manukau.

The Contract Works comprise of:
• Collection of plywood panels from the supplier's yard in Wiri and transport to contractor's facility for off-site sealcoating. Following sealcoating, allow for transportation of panels from the contractor's facility to the project site.
• Off-site sealcoating of the plywood deck panels and including delivery to site.
• Installation of temporary access required to undertake the works.
• Removal of the existing w-section barrier and safety rails, removal of the existing SMA surfacing, and removal of the existing timber deck.
• Installation of plywood panels. The refurbished deck construction compromises 195mm thick plywood panels clamped to the underside of the top flange of the existing beams with steel clamp plates bolted to the underside of the panels.
• Steelwork strengthening involving the installation of transverse diaphragms and tension bracing.
• The existing steelwork coating system will be prepared and fully re-coated with a new paint system.
• The current safety barrier system will be upgraded to incorporate a new TL4 semi rigid guardrail.
• Pavement and surfacing reinstatement/tie-in.
• Other miscellaneous structural maintenance may be included while temporary access is in place.

Only tenderers pre-qualified to level Bridge Construction – Level C (3C) under the terms of the NZTA Prequalification System are eligible to submit a tender.

ALL TENDER QUERIES are to be directed through the [REDACTED] Questions and Answers.
All responses to tender queries/clarifications will be answered by Notice to Tenderer which will be available in the [REDACTED] addenda.

Tender submissions shall be uploaded to [REDACTED] eTender box in one single file. The [REDACTED] file upload limit is 50MB. The file should be labelled:
- Tender for Contract 12000: SH25 Moana-Anu-Anu (Wentworth) River Bridge Refurbishment.

Tender submissions will only be accepted electronically via the [REDACTED] eTender Box.
Instructions: [REDACTED]

Contract Valuation

Contract Value ($ NZD)

Duration

The figures provided above are computer-generated estimates derived from historical data, predefined assumptions, and available opportunity listing information. This is intended to serve as a guide and therefore may not accurately reflect the size of this opportunity.

Map

Sign in to unlock more.

By signing in, you will be able to:

  • See contract valuation estimates.
  • Use BidAssist — a robust bidding assistant for a competitive edge.
  • Use Tender Intelligence — download documents relevant to this opportunity.
  • Download this opportunity

    Download all RFx documents:

    • Tender RFx (RFP/ROI)
    • Pricing Schedule
    • Tender Documents

    Instant delivery to your inbox

    Timeline

    Open Date

    Tender opened

    03 Jul 2025

    27 days ago

    Closing Date

    Tender closing

    14 Aug 2025

    in 15 days

    Title
    12000 - SH25 Moana-Anu-Anu (Wentworth) River Bridge Refurbishment
    Last Updated
    29 Jul 2025
    Closing Date
    14 Aug 2025 04PM
    Status
    Open
    Tender Type
    Public
    Categories
    Created
    3 weeks ago
    More similar opportunities

    Clinical Services - Request for Application

    Open Closing in 1065 days
    17 Regions
    Accident Compensation Corporation

    Low Emissions Heavy Vehicle Fund

    Open Closing in 1034 days
    17 Regions
    Energy Efficiency & Conservation Authority

    Vocational Medical Services (VMS) Services Contract

    Open Closing in 699 days
    17 Regions
    Accident Compensation Corporation